Assembly Hall Construction (3) | University of Illinois Archives

No preview for this item is publicly available. Contact the archives for information about accessing this item.

image (JPEG Image, 275.32 KB)


Email us to request a hi-resolution copy.

Title:
Assembly Hall Construction (3)
Date:
Dec. 6, 1962
Description:

Aerial view of the Assembly Hall nearing completion with a caption accompanying the photo that reads: "Giant Dome Finished -- The final bucket of 3,042 cubic yards of concrete was poured today for the giant dome of the University of Illinois $7,750,000 Assembly Hall, completing the reinforced lightweight concrete folded plate roof. Dome diameter is 400 feet. The view shows depth of the folded plate roof, from the shadows. Dome will be covered with water-proof plastic and a plastic coat which will glow."

Found in RS: 39/2/20, Box BUI - Assembly Hall, Folder BUI - Assembly Hall Construction 1960

Phys. Desc:
Tiff
ID:
0005065
Repository:
University of Illinois Archives
Found in:
Creators:
Subjects:
Rights:

Copyright Associated Press.

Copyright of this image is NOT owned by the University of Illinois. Please contact us if you would like to request a copy for personal use. *



Page Generated in: 0.11 seconds (using 84 queries).
Using 7.02MB of memory. (Peak of 7.23MB.)

Powered by Archon Version 3.21 rev-3
Copyright ©2017 The University of Illinois at Urbana-Champaign