Assembly Hall Construction Aerial View | University of Illinois Archives

No preview for this item is publicly available. Contact the archives for information about accessing this item.

image (JPEG Image, 207.34 KB)


Email us to request a hi-resolution copy.

Title:
Assembly Hall Construction Aerial View
Date:
Jun. 20, 1961
Description:

View of Assembly Hall construction from an AP photo with a caption that reads, "JUNE 20 - PREPARE TO POUR ASSEMBLY HALL ROOF. Contractors are pushing to start pouring the roof of the new $7,750,000 Assembly Hall at the University of Illinois. The photograph shows the forms for the folded plate concrete. The forms extend across the Assembly Hall, and as one set is poured the forms will be moved for pouring another area. These are the only forms to be built. They will be moved around the perimeter. The view also shows the extent of the depth of the steps upon which seats will be placed within the hall."

Found in RS 39/2/20, Box BUI - Assembly Hall, Folder BUI - Assembly Hall Construction 1961

Negative Number 16360, RS: 39/2/22

Phys. Desc:
Tiff
ID:
0002159
Repository:
University of Illinois Archives
Found in:
Creators:
Subjects:
Publisher:
Associated Press
Rights:

Copyright Associated Press.

Copyright of this image is NOT owned by the University of Illinois. Please contact us if you would like to request a copy for personal use. *



Page Generated in: 0.104 seconds (using 84 queries).
Using 7.01MB of memory. (Peak of 7.23MB.)

Powered by Archon Version 3.21 rev-3
Copyright ©2017 The University of Illinois at Urbana-Champaign